# DCLXVI next work cycle

September 28–October 2, 2026 · revision 2026-09-24-r1

Lead: Ben Đ Om. Dates are review targets. Resources are uncommitted planning allowances; no purchases or external funding are represented as approved.

## haven

- Status: Queued
- Review: 2026-10-02
- Deliverable: One room layout and resident-day cost ledger
- Acceptance: Document space, service access, utilities, cleaning labor and who pays.
- Resources: Desk design; purchasing not allocated

## skyway

- Status: Active prototype definition
- Review: 2026-10-02
- Deliverable: Print the passive docking alignment pair; record 100 prescribed trials
- Acceptance: At least 95 fully seated trials, no damage, at most 10 N insertion force and at most 0.5 mm seated gap.
- Resources: Proposed $150 materials ceiling; purchases not placed

## meridian

- Status: Architecture aligned; model work queued
- Review: 2026-10-02
- Deliverable: Support–carrier–conductor–radiator mass iteration
- Acceptance: Retain failed cases and show whether mass and power converge; use measured component data before hardware scale-up.
- Resources: Model-only phase; construction not allocated

## dewcell

- Status: Awaiting reaction specification
- Review: 2026-10-02
- Deliverable: A reaction, feedstock and complete energy-accounting sheet
- Acceptance: State every input, output, proposed reaction product and the null result before selecting an apparatus.
- Resources: Specification only

## lightloom

- Status: Queued
- Review: 2026-10-02
- Deliverable: One species, one destination surface and a serial/parallel comparison
- Acceptance: Compare verified delivery per second at the same survival and placement-error requirements.
- Resources: Model-only phase

## deepview

- Status: Queued
- Review: 2026-10-02
- Deliverable: A named public dataset and reproducible model-comparison protocol
- Acceptance: Fix predictions and residual metrics before comparison; define the scale of any cavity being tested.
- Resources: Desk study

## neural-bridge

- Status: Queued
- Review: 2026-10-02
- Deliverable: A simulated cursor-selection task and ordinary-control baseline
- Acceptance: Declare task success, latency and error measures; no human study is started.
- Resources: Simulation only

## kindred

- Status: Next physical candidate
- Review: 2026-10-02
- Deliverable: One compliant-joint drawing and measurement protocol
- Acceptance: Fix a low-force envelope and measure displacement, force and stored energy before selecting an actuator.
- Resources: Parts allowance not allocated

## atlas

- Status: Active benchmark
- Review: 2026-10-02
- Deliverable: Reproduce the existing v15 proton/electron mass accounting
- Acceptance: Exact independent arithmetic and complete residual report; physical agreement remains a separate result.
- Resources: Existing compute; no purchases

## radix

- Status: Queued
- Review: 2026-10-02
- Deliverable: Matched decimal, binary and hexadecimal sample activities
- Acceptance: Equal task content and exposure time; define scoring and transfer outcomes before recruiting.
- Resources: Content design only

## concord

- Status: Queued
- Review: 2026-10-02
- Deliverable: One operational hypothesis and communication-control matrix
- Acceptance: Write the null model, endpoint and analysis before collecting data.
- Resources: Study design only

## earth-radiator

- Status: Queued
- Review: 2026-10-02
- Deliverable: A complete metering diagram for one small thermal loop
- Acceptance: Account for heater input, pumping, storage and rejection without double counting.
- Resources: Design only; components not allocated

## kw-into-kc

- Status: Queued
- Review: 2026-10-02
- Deliverable: One station cost sheet and a food-formulation partner brief
- Acceptance: Define intended users, servings, nutrient requirements, traceability, water source and operating costs.
- Resources: Planning only; no food distribution started

## lattice-drive

- Status: Awaiting coupling law
- Review: 2026-10-02
- Deliverable: A creation–stroke–recovery model with an explicit momentum carrier
- Acceptance: Derive the coupling and predict reversal behavior; close the whole-device energy and momentum accounts.
- Resources: Analytical work only

## nBTC

Developer release v0.2. Next operational gate: shared test network, persistent wallets, physical hardware handoff and a recovery drill. The site does not accept live coin balances.
